Sunday, January 20, 2008

Lightings up!


New switches

MBR toilet vanity top and basin

BB room light



Kitchen light


Kitchen

Kitchen sliding door

Study table



Shoe cabinet

Kitchen








Went down to do some clean up yday.Although the day before our contractor did some cleaning for us but the floor is still very dirty and dusty.Yup could be due to some units still renovating.Anyway our reno is not completed yet.MBR toilet glass partition not up yet,plumping going to start on Mon,glass and mirror of the whole hse is not up yet,and last coat of painting oso to start on Mon,2 bedroom doors not installed yet.On wed the flat can be handed over to us.I hope so.Delivery of my electical appliances and furnitures will arrive subsequently from wed onwards.
























Wednesday, January 16, 2008

Reno continues...

WIW
Partition beside MBR tv wall
MBR tv console area
Small corner of studyroom
WIW
WIW

False ceiling at living area
False ceiling at walkway to rooms
Box up at MBR toilet
Black tiles for MBR toilet



Wirings hanging at dining area
Wires at Living hall tv console
Partition between living and dining area
False ceiling at dining area
false deiling at living area



Kitchen plastering done

Walkway to rooms


My Mitsubishi starmex inverter at living hall



MBR & Bedrm 3 after wall being hacked.so big hor
Study table area
MBR
MBR toilet






Tuesday, January 15, 2008

Reno finally starts...

Kitchen (Plastering in progress)
Walkway to rooms
Left side of MBR
Right side of MBR
Study room cum WIW
Main door
Dining area
Kitchen and common toilet entrance
Living area
Living area


Before reno starts protection sheets laid.

Monday, January 7, 2008

Our new home...

Living cum Dining area


Common toilet


Master bedroom

Collected our keys in july.After that we went to visit our new home to be.

As i was pregnant that time we din start the renovation until Dec.